
Dam Desilting in Warwick, QLD
Warwick and the Southern Downs run drier than the Toowoomba side, which makes a full dam worth even more when the season turns. We desilt and repair stock and storage dams right across the Warwick district, on the grazing and cropping country alike. Drain it down, dig the silt clear, reshape the wall and get the capacity back to where it should be. We time the work for when the dam's low and the ground's firm, so you refill with a proper storage ahead of the next dry. Warwick is a regular run for us out of Oakey.
How the job runs.
- Capacity and silt assessment before quoting
- Excavator silt removal hauled clear of the wall
- Dam wall and spillway repair where it's slumped or leaking
- Spoil placed to a contour bank, low spot or stockpile
Dam desilting around Warwick typically runs $6,000 – $25,000 depending on size and silt volume. Call for a site-specific quote.
Projects in the area.
Dam Desilting in Warwick.
Yes. While the dam's down we can key in and re-core a leaking wall, repair the spillway and reshape the bank in the one job.
Late summer into autumn when the dam's at its lowest and the surrounding ground is firm enough to work.
Most times desilting an existing dam restores good capacity for far less than a new build. We'll tell you straight after we've looked at it.
Dam Desilting in Warwick?
Call Tyrone direct. No call centres, no middlemen. Quick chat, clear quote.


